The Roofscape LevelPro series LP406 – LP414 pedestal support has been designed for the installation of any type of tile floor on any surface, allowing the underlying inspection of the various systems and potential waterproofing, with no need to carry out any demolition. Beyond LP406, the tower extension drop and clip system is used to achieve the higher heights.

Thanks to the innovative system of adjustment from above, the perfect final levelling of the floor with millimetric height adjustment is obtained by using the Topkey key, in addition to the self-levelling capacity of the head which adapts to inclinations of the supporting surface of up to 5%.

To complete the absolute versatility of the system, 2 rings with different functions are supplied: the Level Lock (LP-LL) in case it is necessary to compensate for the self-levelling effect of the head, and the Rotation Lock (LP-RL) in case it is necessary to adjust the height on the sides as in the case of installation in the center of the tile/paver.

Both rings are fixed to the head of the support and can be used individually or combined. The included 2 mm thick rubber leveler, to be applied over the head, reduces the foot-traffic noise by reducing contact between the tile/paver and the head.

  • LP406: 5” – 8.875” (125 – 225mm)
  • LP407: 8.875” – 12.75” (225– 325mm)
  • LP408: 12.75” – 16.75” (325 – 425mm)
  • LP409: 16.75” – 20.75” (425 – 525mm)
  • LP410: 20.75” – 24.75” (525 – 625mm)
  • LP411: 24.75” – 28.5” (625 – 725mm)
  • LP412: 28.5” – 32.5” (725 – 825mm)
  • LP413: 32.5” – 36.25” (825 – 925mm)
  • LP414: 36.5” – 40” (925 – 1025mm)

HyppoCoat 100 is an aliphatic, two-component, fast-setting, rapid-curing, solvent-free*, high-performance, and high-solids polyurea/urethane polymer waterproof coating that can be utilized suitably for heavy-duty wearing surface

HyppoCoat GC (Green Concrete) is a user-friendly, high solids, single component, liquid applied membrane for cured or green concrete. The system uses two coats of

Designed as a cold-applied alternative to the hot rubberized asphalt RamTough 250, Barrett’s Black Pearl® Waterproofing System is composed of two primary products—Black Pearl® Adhesive

RamTough 250 is Hot Rubberized Asphalt Roofing & Waterproofing Membrane Waterproofing System that is uncompromising, tough, durable, and offers peace of mind to the owner

The main components utilized in Greenroof-Roofscapes® systems are the waterproofing membrane, layers for protection, drainage, water retention, and aeration, layers of insulation, soil overburden &

HyppoCoat 250 is a liquid applied, high-solids, water-catalyzed polyurethane deck system that creates a seamless, joint-free, tack-free membrane for concrete, wood, and metal surfaces. HyppoCoat

Ram Cold Tar® Plus is a unique thermoplastic SBS rubber coating compound that is used for the repair and restoration of existing asphalt, coal tar,

The RamProof GC Waterproofing System is a fully reinforced, cold fluid-applied solution engineered for demanding structural waterproofing applications such as plaza decks, foundations, tunnels, and

The Ram QuikFlash® PMMA roofing system is a highly durable, cold liquid-applied membrane that cures in just one hour, making it ideal for rapid, same-day

RamTough KLB-100 roof assemblies combine the flexibility of single-ply with the durable redundancy of built-up roofing (BUR) technology. Formulated with Kraton® SEBS rubber polymer and

Project Profiles

The original project scope of the Baltimore Convention Center called for the replacement of the existing roof membrane due to membrane failure and subsequent leaking into the Convention Center’s main halls below. Once the site was studied, the Barrett Company suggested that the Convention Center take advantage of the opportunity to upgrade the aesthetic and functional qualities of the Terrace with a Greenroof installation.

Project Profiles

Belle Square is a dynamic complex integrating four main components: residential, office, retail and parking in the center.

Project Profiles

The renovation and improvement of North Burnham Park and the rebuilding of Soldier Field, home to the Chicago Bears, is located on a 96-acre site between the Field Museum and McCormick Place.

Project Profiles

A 92-year-old monument surrounded in priceless marble which took 50 years to build presented a unique challenge – and no room for error – for the company tasked with the first skylight and roof replacement project of the Lincoln Memorial in Washington, D.C., in 1995.

Willis Tower | Chicago, IL

Project Profiles

When you think of a big city, often what immediately jumps to mind are skyscrapers, traffic, and your favorite sports team. But many of these big cities are also known to produce a lot of emissions that spread into the atmosphere. One of the biggest culprits of this growing problem—Chicago.

Project Profiles

Salesforce Transit Center is a landmark for the San Francisco Bay Area. This striking, innovative, and sustainable multi-story building transforms a transportation hub into an urban experience, complete with a gondola, and topped off by a 5.4-acre rooftop park open to the sky.

Project Profiles

In 2011, the D.C. Public Library began plans for the modernization of the Martin Luther King Jr. Memorial Library. The original vision for the Washington, D.C. landmark, designed by modern master Ludwig Mies van der Rohe, used transparency and light as metaphors for freedom and knowledge, the very principles of Dr. King’s life teachings. More than 40 years later, the team at OTJ Architects was selected to helm the transformation of Washington’s Central Public Library.

Project Profiles

In 2005, the Federal Deposit Insurance Corporation (FDIC) adopted a new objective— To evaluate & measure the operational energy conservation of its Virginia Square facility and identify opportunities to further conserve energy and reduce utility costs.

Project Profiles

Can you imagine the weight of about 125 semi-trucks, but in gold? Approximately, ­­­10 million pounds, or $236.4 billion, of gold is held at the Fort Knox Bullion Depository, also known as the “gold vault,” in Fort Knox, Kentucky. The vault holds more than half of the gold reserves of the United States making the protection of the contents of the vault a top priority for the contractors and architects tasked with reroofing it.

Project Profiles

After evaluating the roof of their 240,000 sq/ft facilities building, the management team at LinkBelt Construction Equipment did just that. Thanks to Barrett’s Ram Cold Tar® Plus roof restoration & repair system & Ram Ultra-Silver® reflective aluminum finish, the result was a new, fully detailed, watertight roofing system that saved the company time, money, and energy.