The Maroon Sedum-mix blanket is a ready-to-lay ground cover vegetation blanket for roundabouts, central reservations, roof terraces, and more. Grown in a mineral-based substrate layer on a biodegradable coconut fibre mat, the Maroon Sedum-Mix Blanket contains 6 to 7 different succulent varieties specially selected to create a red assorted vegetation blanket.
The Sedum-mix blanket is the most widely applied product for directly green extensive green roof system, also called Sedum roofs. On delivery our vegetation blankets always boasts at least 85% coverage. All of Barrett’s Greenroof-Roofscapes® vegetation blankets are produced in accordance with FLL guidelines.
The Maroon Sedum-mix blanket contains a plant mix consisting of 6 to 7 succulent varieties. The plants has been specially selected to create a red assorted vegetation blanket. The plants grow in a mineral based substrate layer on a biodegradable coconut fibre carrier. Sedum is a succulent plant that is well able to store water in its leaves and therefore grows perfectly under diverse weather conditions.
The maximum gradient for the Maroon Sedum-mix blanket is up to 31 degrees (7:12). The minimum maintenance will depend on the system structure (fertilization one to three times a year).
HyppoCoat 100 is an aliphatic, two-component, fast-setting, rapid-curing, solvent-free*, high-performance, and high-solids polyurea/urethane polymer waterproof coating that can be utilized suitably for heavy-duty wearing surface
HyppoCoat GC (Green Concrete) is a user-friendly, high solids, single component, liquid applied membrane for cured or green concrete. The system uses two coats of
Designed as a cold-applied alternative to the hot rubberized asphalt RamTough 250, Barrett’s Black Pearl® Waterproofing System is composed of two primary products—Black Pearl® Adhesive
RamTough 250 is Hot Rubberized Asphalt Roofing & Waterproofing Membrane Waterproofing System that is uncompromising, tough, durable, and offers peace of mind to the owner
The main components utilized in Greenroof-Roofscapes® systems are the waterproofing membrane, layers for protection, drainage, water retention, and aeration, layers of insulation, soil overburden &
HyppoCoat 250 is a liquid applied, high-solids, water-catalyzed polyurethane deck system that creates a seamless, joint-free, tack-free membrane for concrete, wood, and metal surfaces. HyppoCoat
Ram Cold Tar® Plus is a unique thermoplastic SBS rubber coating compound that is used for the repair and restoration of existing asphalt, coal tar,
The RamProof GC Waterproofing System is a fully reinforced, cold fluid-applied solution engineered for demanding structural waterproofing applications such as plaza decks, foundations, tunnels, and
The Ram QuikFlash® PMMA roofing system is a highly durable, cold liquid-applied membrane that cures in just one hour, making it ideal for rapid, same-day
RamTough KLB-100 roof assemblies combine the flexibility of single-ply with the durable redundancy of built-up roofing (BUR) technology. Formulated with Kraton® SEBS rubber polymer and
The original project scope of the Baltimore Convention Center called for the replacement of the existing roof membrane due to membrane failure and subsequent leaking into the Convention Center’s main halls below. Once the site was studied, the Barrett Company suggested that the Convention Center take advantage of the opportunity to upgrade the aesthetic and functional qualities of the Terrace with a Greenroof installation.
Belle Square is a dynamic complex integrating four main components: residential, office, retail and parking in the center.
The renovation and improvement of North Burnham Park and the rebuilding of Soldier Field, home to the Chicago Bears, is located on a 96-acre site between the Field Museum and McCormick Place.
A 92-year-old monument surrounded in priceless marble which took 50 years to build presented a unique challenge – and no room for error – for the company tasked with the first skylight and roof replacement project of the Lincoln Memorial in Washington, D.C., in 1995.
When you think of a big city, often what immediately jumps to mind are skyscrapers, traffic, and your favorite sports team. But many of these big cities are also known to produce a lot of emissions that spread into the atmosphere. One of the biggest culprits of this growing problem—Chicago.
Salesforce Transit Center is a landmark for the San Francisco Bay Area. This striking, innovative, and sustainable multi-story building transforms a transportation hub into an urban experience, complete with a gondola, and topped off by a 5.4-acre rooftop park open to the sky.
In 2011, the D.C. Public Library began plans for the modernization of the Martin Luther King Jr. Memorial Library. The original vision for the Washington, D.C. landmark, designed by modern master Ludwig Mies van der Rohe, used transparency and light as metaphors for freedom and knowledge, the very principles of Dr. King’s life teachings. More than 40 years later, the team at OTJ Architects was selected to helm the transformation of Washington’s Central Public Library.
In 2005, the Federal Deposit Insurance Corporation (FDIC) adopted a new objective— To evaluate & measure the operational energy conservation of its Virginia Square facility and identify opportunities to further conserve energy and reduce utility costs.
Can you imagine the weight of about 125 semi-trucks, but in gold? Approximately, 10 million pounds, or $236.4 billion, of gold is held at the Fort Knox Bullion Depository, also known as the “gold vault,” in Fort Knox, Kentucky. The vault holds more than half of the gold reserves of the United States making the protection of the contents of the vault a top priority for the contractors and architects tasked with reroofing it.
After evaluating the roof of their 240,000 sq/ft facilities building, the management team at LinkBelt Construction Equipment did just that. Thanks to Barrett’s Ram Cold Tar® Plus roof restoration & repair system & Ram Ultra-Silver® reflective aluminum finish, the result was a new, fully detailed, watertight roofing system that saved the company time, money, and energy.