Project Profile
Fort Wood – Statue of Liberty National Monument | New York, NY
At the foot of the Statue of Liberty, Fort Wood had weathered two centuries in New York Harbor. Heaving pavers created tripping hazards, and leaks threatened the Statue’s electrical and mechanical systems below. For the $27.5 million rehabilitation of the 50,000-square-foot terreplein, the National Park Service turned to Barrett’s Black Pearl® cold-applied waterproofing system to protect this American icon for generations.
Project Details:
Job Size:
4,000 sq ft of historic stone
Client/Owner:
National Park Service
Project Value:
$27.5 million
Funding:
Great American Outdoors Act (GAOA)
Waterproofing Contractor:
Titan Roofing
Engineer:
WJE Engineering
Building Type:
Historic / Monument
Completion:
November 2025
OVERVIEW
More than 70 years after Fort Wood was completed, the Statue of Liberty was built on its pedestal in the middle of the fort. Over the following century, the terreplein and the area between the fort’s interior walls and the pedestal became an elevated walking plaza overlooking New York Harbor. The space also became home to the American Museum of Immigration.
The terreplein surface was last rehabilitated during the Statue of Liberty restoration in the 1980s. In the 40 years since, the paving had deteriorated, and freeze-thaw cycles in the earth underneath caused the pavers to heave and shift.
The biggest concern was the crumbling, displaced granite and bluestone pavers across the terreplein. They created tripping hazards and severely limited accessibility for visitors. The damaged surface also let rainwater pool and leak into and beneath the plaza. That caused problems in the interior spaces below, some of which house the Statue’s electrical and mechanical infrastructure.
PROTECTING A NATIONAL ICON
The park’s historical resource specialists worked closely with architects, engineers, and masonry experts to define the full scope of repairs. That scope included high-performance waterproofing and drainage for every area of the terreplein that sits over vulnerable spaces below.
As with any historic or monumental restoration, the specified materials had to provide durable, lasting protection while keeping the character and appearance of the fort and pedestal intact. With an average of 10,000 to 20,000 visitors a day, the project also had to move quickly and keep disruption to a minimum.
For those reasons, the National Park Service turned to Barrett’s Black Pearl® cold-applied rubberized asphalt hybrid waterproofing system.
THE BLACK PEARL® SYSTEM
Black Pearl® is cold-applied waterproofing made up of two primary products: Black Pearl® Adhesive and Black Pearl® Sheet Membrane.
Black Pearl® Adhesive is built on a core formula of select, unoxidized asphalt cement, butyl rubber, styrene-isoprene-styrene (SIS), neoprene rubber, styrene-butadiene-styrene (SBS) rubber, carbon black, fillers, plasticizers, and curing agents. Black Pearl® Primer Adhesive also contains an aliphatic solvent that meets current OSHA and EPA regulations.
Black Pearl® Sheet Membrane is a 55-mil, fiberglass-reinforced woven polyester fabric coated on both sides with the same rubberized formula as the adhesive. A peelable polyethylene release liner protects the coated fabric, which makes the sheets easy to stage and walk on during application.
The two components are fully compatible. The adhesive acts as a catalyst on the sheets and chemically fuses every part of the system, including flashings, into a thick, semi-monolithic waterproof membrane built for long-term durability and protection.
PRESERVING AND PROTECTING A HISTORICAL SITE
Funded by the Great American Outdoors Act (GAOA), the project delivered drainage and safety improvements that will help preserve this historical monumental structure and make it more accessible to visitors.
The GAOA’s National Parks and Public Land Legacy Restoration Fund was created to address the deferred-maintenance backlog across America’s national parks, providing up to $1.3 billion per year for five years. At Statue of Liberty National Monument, that funding went to the place where it was needed most: the base of the monument itself.
“Fort Wood has weathered two centuries of exposure to the elements in the middle of New York Harbor,” said John Piltzecker, superintendent of Statue of Liberty National Monument and Ellis Island, when the project’s construction contract was announced in 2022.
The finished work and rehabilitation goes well beyond a new surface and included:
- New granite pavers across the 50,000-square-foot walking surface to remove tripping hazards and improve accessibility
- Corrected drainage to stop water from pooling and leaking into the spaces below
- Snowmelt conduit installed beneath the surface to help keep the plaza safe in winter
- Structural and masonry repairs, including anchoring the granite cladding on the fort’s two exterior staircases and repairing the slab over utility rooms and the lobby
The work went on in phases while the monument stayed open to visitors, and it was completed in November 2025. Today, Fort Wood is protected from water infiltration, its walking surface is safer and more accessible, and its historic character is preserved. Lady Liberty’s foundation is ready for the next century.